Sweetwater Office

Land development engineering for a 3.1-acre lot in Bee Cave has been completed. Engineering included site layout, grading, drainage piping to existing regional water quality and detention ponds, utilities, and erosion and sedimentation controls design. Spearheaded submission and approval by multiple permitting authorities including City of Bee Cave, Travis County, LCRA, and TCEQ.

Structural and MEP Engineering was performed for the 37,500 square foot two-story office building.

Client:
Villa Park Architecture, Dorado Development
Office involved:
Location:
Bee Cave, TX
Project type:
Land Development
Client type:
Private
Design start:
2022
Construction completed:
2023
Our role was:
Prime Consultant
Project value:
Services provided:
Civil Engineering
Structural Engineering
MEP Engineering